Summary
Utilization targets are a measure of expected working and productive hours by worker by day. This fact table is at a detailed level to simplify utilization reporting over any time period.
Utilization targets are a Projects360 feature that rely on setting up a calendar, working days, applying the calendar to a worker, and setting up the worker’s utilization targets.
Dynamics 365 Menu Item(s)
- Project management and accounting > Projects360 BI Setup > Utilization targets > Utilization transactions (Button)
Legacy data model’s data entities
- PMBI_deFACTUtilizationTarget
New data model’s data entities
- PMBI_PMIPUtilizationTargetsTransEntity
- PMBI_PMIPUtilizationTargetsEntity
- FNBI_SqlDictionaryEntity
Synapse link approach tables
- PMIPUtilizationTargetsTrans
- PMIPUtilizationTargets
- SqlDictionary
Field level functional description
- Currency: The currency in which realization amounts and rates are measured.
- FTEPercent: The Full-Time Equivalent percentage, representing the proportion of a full-time workload assigned as a target.
- ProjTransDateUtilizationTarget: The project transaction date associated with the utilization target, used for time-based analysis.
- RealizationAmount: The actual monetary amount realized, often compared against targets.
- RealizationRate: The actual realization rate, typically calculated as a percentage of revenue or billable hours achieved versus target.
- RealizationRateSetup: The setup or planned realization rate, used as a benchmark for performance.
- TargetTotal_: The total target value (such as hours or amount) set for utilization.
- TargetUtilized_: The portion of the target that has been utilized or achieved.
- UtilizationName: The name or description of the utilization metric or category (e.g., billable, non-billable).
- UtilizationTargetPercent: The target utilization percentage set for a resource, role, or group.
- WorkDayDate: The specific workday date for which the utilization target is set.