Earned Value Management Report Performance Enhancement

Overview

The Earned Value Management Report has been enhanced to improve performance and overall usability. Initially, a performance analysis was conducted to evaluate report load times and visual efficiency. Based on the analysis results, key visuals such as image, Visuals, Earned Value related metrics were identified as contributing to higher load times. After optimization, the report performance improved by approximately 74%, resulting in faster rendering and improved responsiveness, and a smoother user experience.

What Changed:

As part of the performance optimization introduced in release 10.0.46, the Auto Date/Time feature was disabled to improve report efficiency and rendering consistency. This change removed automatic date hierarchies, which affected visuals that rely on them. The required date hierarchy fields (Year, Quarter, Month) must be reintroduced manually to restore correct visual behavior.

Action Required:

Affected visuals must be repaired by manually adding the required date hierarchy fields for visuals shown in the following:
  • Project Details (Page 2):

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment